A line is built, and at some point somebody says it is finished. What that means, in money, is that a payment is released and the customer's own installation window begins. The word rests entirely on an acceptance test — and if the protocol says the system will be demonstrated to operate correctly, then finished means whatever the two parties can agree in a room on a Friday afternoon with a lorry booked.
We edit what automation integrators and machine builders produce — factory and site acceptance test protocols and their pass criteria, commissioning and validation documentation, functional and design specifications, machine risk assessments and residual risk documentation, operation and maintenance manual content, alarm and diagnostic message text, operator interface text and screen content, training material for operators and maintainers, punch list and outstanding items documentation, and performance and throughput demonstration documentation. Our editors work on the protocol that defines finished.
The acceptance test protocol is where an automation project either concludes or drifts, and its failure is testing that things work rather than defining what passing means. A protocol listing functions to be demonstrated will be executed, and every marginal result will be argued about. We work through these so each test states the input, the expected result and the tolerance, since "verify the reject station operates" is a demonstration and "with 20 known-bad parts introduced at random, all 20 are rejected and no good part is rejected" is a test; so the throughput demonstration specifies the duration, the product mix, who supplies the parts and what counts as an interruption, because a rate achieved for eleven minutes with perfect material is not the rate; so failures are categorised in advance — what stops acceptance, what is accepted with a punch item, and what is a customer issue — as this categorisation is otherwise negotiated under pressure with money attached; so retest rules are stated, given that a fixed fault retested only for that fault is how a system passes without working; so the protocol names what is explicitly not being tested at this stage and when it will be; so any test requiring the customer's own material, network or upstream equipment is flagged early with what happens if it is not available; and so the person who signs and what their signature releases is stated. Protocols written this way end projects.
Everything you send is treated in confidence, including specifications, protocols and customer information. We are editors rather than automation or safety engineers, and we offer no view on system design, testing or acceptance. What we can do is make passing a defined outcome rather than a negotiation.
Key Industrial Automation vocabulary
- Factory acceptance test
- Site acceptance test
- Test with input, expected result and tolerance
- Demonstration versus test
- Known-bad parts introduced
- False reject rate
- Throughput demonstration duration
- Product mix during the run
- Who supplies the test parts
- What counts as an interruption
- Availability calculation during the test
- Failure categorised in advance
- Stops acceptance
- Accepted with a punch item
- Customer issue rather than a defect
- Retest rule after a fix
- Regression retest scope
- Not tested at this stage
- When the deferred test occurs
- Dependency on customer material
- Dependency on customer network
- Upstream equipment availability
- Punch list and its closure dates
- Signature and what it releases
- Payment milestone linked to acceptance
- Provisional and final acceptance
- Warranty start date
- Residual risk in the manual
- Alarm and diagnostic message text
- Operator interface wording
- Operator and maintainer training record
- Handover of source code and backups