Flooring Editing and Proofreading Services
The floor lifts in March. The manufacturer says the subfloor was too wet, the contractor says it was tested and dry, the client says nobody told them the heating had to be run for three weeks first. Everybody is partly right, and the argument is settled — or not — by a single sheet of paper recording what the moisture meter said, where, and when.
We edit what flooring contractors and suppliers produce — subfloor moisture test records and their reporting, site condition and acclimatisation requirements, installation method statements and specifications, warranty documentation and its conditions, pre-installation checklists for clients and main contractors, screed and substrate preparation specifications, adhesive and underlay documentation, expansion and movement provision guidance, maintenance and cleaning instructions, remedial and inspection reports, and quotation documents and their exclusions. Our editors work on the record the warranty depends on.
The moisture test record and the site conditions around it are what decide who pays when a floor fails, and their failure is a single reading with a tick beside it. We work through these so the test is recorded with the method used and its units, since a surface reading from a pin meter and a relative humidity reading from an in-situ probe measure different things and only one of them tells you about the moisture below; so every reading is located on a plan rather than described, and the number of readings relates to the area, because a single reading in a two-hundred-square-metre slab is a sample of one; so the probe's equilibration time is recorded, given that a hood or sleeve read early gives a comfortingly low number; so the ambient temperature and humidity at the time are logged, as the acceptance figure depends on them; so the conditions the installation depends on afterwards are stated as obligations with owners — who runs the heating, from when, at what temperature, and who confirms it — since this is the condition most often breached and least often written down; so any reading outside the acceptable range is recorded with what was done rather than retested until it passes; and so the warranty document lists the conditions in the same terms as the test record. Records written this way end the argument in an afternoon.
Everything you send is treated in confidence, including test records, specifications and client information. We are editors rather than flooring, screed or moisture specialists, and we offer no view on test methods, acceptance criteria or product suitability. What we can do is make the record match what the warranty requires.
Key Flooring vocabulary
- Subfloor moisture test
- In-situ relative humidity probe
- Hygrometer hood
- Pin and pinless surface meter
- Method and units recorded
- Equilibration time
- Reading taken too early
- Number of readings per area
- Readings located on a plan
- Ambient temperature and humidity at test
- Acceptance threshold
- Reading outside range and action taken
- Retesting until it passes
- Damp proof membrane
- Surface damp proof membrane application
- Screed drying rate
- Force drying and commissioning the heating
- Underfloor heating commissioning cycle
- Heating run before installation
- Acclimatisation of the material
- Site conditions during installation
- Conditions after installation with owners
- Adhesive open and working time
- Substrate flatness tolerance
- Surface regularity deviation
- Preparation and priming
- Expansion and perimeter gaps
- Movement joint continuation
- Warranty conditions
- What voids the warranty
- Maintenance and cleaning regime
- Inspection and remedial report
Flooring Word Challenge
Even seasoned pros miss these — give it a shot.
« More Construction and Trades editing | All editing services